Goal: Preserve existing infrastructure

Objective: Meet the 2020 and 2022 PM2 targets approved for the Champaign-Urbana MPA

Performance Measure: PM2

Data Sources: IDOT


Freight-2020 and 2022 PM2

Performance Measure 2017 Baseline 2020 Target 2022 Target 2018 Performance 2019 Performance 2020 Target Achieved? Maintained or Improved from Baseline?
Percent of Interstate Pavement in Good condition 62.93% 65.00% 65.00% 79.20% 50.71% TBD No
Percent of Interstate Pavements in Poor condition 0.00% <5.00% <5.00% 0.10% 3.94% TBD No
Percent of NHS bridge classified as in Poor condition 35.80% 13.00% 14.00% 40.40% 37.14% TBD No
Percent of NHS bridges classified as in Good condition 14.80% 28.00% 27.00% 15.40% 14.82% TBD Yes
Percent of non-Interstate NHS pavements in Good condition 33.12% 27.00% 27.00% 31.10% 31.13% TBD No
Percent of non-interstate NHS pavements in Poor condition 0.00% 6.00% 6.00% 12.20% 12.17% TBD No

Champaign-Urbana MPA PM2 2018 data shows two performance measures performed better than the 2017 baseline, and four performed worse than the 2017 baseline. Out of the four performance measures that performed worse than the 2017 baseline, two performed worse than the 2020 target: percent of non-interstate NHS pavements in Poor condition and percent of NHS bridge classified as in Poor condition.

Champaign-Urbana MPA PM2 2019 data shows one performance measure performed better than the 2017 baseline, and five performed worse than the 2017 baseline.

Ratings will be assigned when 2020 and 2022 data become available.